St Michaels Primary

Date: August 2015

St Michaels came to Playsound with a vision of transforming near enough all of their outdoor space. They had extensive areas of tarmac and grass with outdated seating and play equipment. Working with our Sales Manager, a long-term design was created that reinvigorated the Nursery and KS1 areas, producing a stimulating and fun area for children to use.

The design was divided up in to specific areas, and included and shaded seating space, a road track, a trim trail as well as a MUGA area. Each age level also had its own theatre stage, with decorate backdrops and curtains providing stand out playground pieces.

The whole project was completed in two stages, with firstly the Nursery trim trail area completed and later the KS1 space during the summer holidays of 2015. We worked with the school to ensure that disruption was minimal during times when the kids when in class and liaising closely with the site management of St Michaels during the summer meant that access was never an issue.

A smooth installation took place and the end results are impressive. With large features such as a Clamber Stack 2 and road track the impact is immediate as you come in to the school from the main driveway. Children are now making use of the new areas with all aspects of the curriculum covered and provide a thrilling and challenging outdoor environment.

Class Activities


Date : 29 Sep 2015

To Top